搜索
News Center
Location:
Homepage
-
-
-
Relevant matters needing attention when the electric rewinding and slitting machine is put into operation

Relevant matters needing attention when the electric rewinding and slitting machine is put into operation

(Summary description)Before the electric rewinding and slitting machine equipment is put into operation, check whether the working positions are properly adjusted, and the parts that need to be lubricated should be filled with lubricating grease in advance.

Relevant matters needing attention when the electric rewinding and slitting machine is put into operation

(Summary description)Before the electric rewinding and slitting machine equipment is put into operation, check whether the working positions are properly adjusted, and the parts that need to be lubricated should be filled with lubricating grease in advance.

Information

Before the electric rewinding and slitting machine equipment is put into operation, check whether the working positions are properly adjusted, and the parts that need to be lubricated should be filled with lubricating grease in advance. Check that the knives are sharp. After the electric rewinding and slitting machine is all normal, it can be run empty first, check whether there is any abnormality, and input the order to be processed into the computer for inspection in advance; after the automatic slitting machine is put into operation, the equipment should be adjusted in time according to the production situation.

Wholesale electromotion rewinding and slitting machine

The best working condition ensures that the indentation of the slitting machine is moderate, the slitting is free of burrs, and the trimming positions on both sides are appropriate. To ensure the smooth feeding and discharging of the cross-cutting machine and the accurate cutting length, it is also necessary to monitor the operation of the cross-cutting machine connected with production management from time to time to prevent paper jams and defective products; Dust and paper scraps, check the tool and the grinding wheel, drain the water in the oil-moisture height device and the gas storage tank, and check whether there is any abnormality in the running part. Then, cut off the power supply according to the operation requirements of the manual, and maintain the computer operating system.

Keyword:

Scan the QR code to read on your phone

Recommended News

Contact Us

An enterprise that integrates design, production, processing, and sales, and specializes in the production of intelligent machinery. Have modern production management experience and professional technical personnel.

Address:No.9, Zhujin ,Third Street , Zhujin Industrial Zone, LongHu District ,Shantou city,Guangdong , China

Mobile/Wechat/Whatsapp/Facebook

0086-15018366136 ,Mr Mike Wu

Mobile/Wechat/Whatsapp/Facebook

0086-13802331661, Mr Jack Chen

language
中国
韩国
韩国
韩国
韩国
韩国
Hongsheng Technology

Mobile Site

Hongsheng Technology

WeChat Account

Copyright © 2021  Guangdong Hongsheng Technology Co., Ltd.  Power by : www.300.cn 粤ICP备2021090389号  SEO标签